How to Calculate Inventory Benefits
I don’t think the method for calculating inventory benefits has changed significantly since the 1990’s, but there is still a need to review this issue…
I don’t think the method for calculating inventory benefits has changed significantly since the 1990’s, but there is still a need to review this issue…
I have discussed in some of the previous topics the attitude in the 1990’s that kitting was to be avoided at all costs, and replaced…
We are big promoters for the use of simulation modeling to test Mixed Model line designs from a work-flow perspective. Simulation is really a requirement…
In the previous topic I discussed the goal of have a small amount of material at the workstations or Points of Use. How small is…
I remember the days when our rule of thumb for Point of Use material was to try to stock at least a day’s worth of…
We are reviewing the biggest changes in Material Management that have taken place since the 1990’s, and the attitude that Material Management or material handling…
Pulling from overseas is of special importance, because without optimizing material flow from outside suppliers and especially from overseas suppliers, it will be very difficult…
There are many “schools” of Lean Manufacturing. Some are closely aligned with the Toyota Production System (TPS), and tend to use a lot of Japanese…
Welcome to Part 5 of a 5-part series on Lean Design. If you are still here after reading Parts 1-4, you are probably convinced of…
Welcome to Part 4 of a 5-part series on Lean Design. In Part 1 I made the case that the achievement of “flow” is a…